A tunnel is an underground passageway used for foot or vehicular road traffic, for rail traffic, or for a canal. Earth Retention System i.e. the side concrete wall of cut and cover method for tunnel construction is studied here. The research work is conducted to compare the internal force of side wall computed by conventional method and 3-D computer model result. To achieve the objective, 3-D computer modeling of the whole system, subsequent analysis and result interpretation was performed using the software STAAD Pro. To check the quality of the computer results it is compared with the conventional analysis method inspired by Peck. Finally from the comparison of computer aided assessment and manual calculation, it is revealed that conventional calculation is in good agreement with computer aided assessment. Computer aided assessment should be adapted for detail analysis to get deflection, variation of bending moment on different strip etc. However their suitability varies depending on individual case and some perimeter like time, budget etc.
- Arora, K.R (2003) ?Soil Mechanics and Foundation Engineering?, Sixth Edition, Delhi.
- Bickel, J.O., Kuesel, T.R., and King, E.H., (1997), ?Tunnel Engineering Handbook?, (2nd edition) CBS Publishers and Distributors, ISBN 81-239-0543-2, New Delhi, India.
- Braja, M. Das (2004) ?Principles of Foundation Engineering?, Fifth edition, Thomson, California.
- Ellis, Iain. W., (2015).??Ellis\\\' British Railway Engineering Encyclopaedia??(3rd edition.). ISBN10?1326010638, London, United Kingdom.
- Mouratidis (2008), ?The ?Cut-and-Cover? and ?Cover and-Cut? Techniques in Highway Engineering?, EJGE, Volume 13, Bundle F.
- Najafi, M. and Gokhale, S. (2005). \\\"Trenchless Technology, Pipeline and Utility Design, Construction, and Renewal,\\\" McGraw-Hill, New York, NY.
- Peck, R.B., W.E. Hanson, and T.H. Thornburn (1974) ?Foundation Engineering,Second Edition?, John Wiley and Sons, New York.
- Pakiman, K., Ashoori, T., Najafi, M., and Tabesh, A. (2015), \\\"Challenges for Shaft Excavation during a Microtunneling Project in Urban Environment.\\\" ISTT Conference, Istanbul, Turkey.
- Waheed, K.A., (2008), ?A Study on Application of Cut and Cover Method for the Construction of Metro Rail Tunnel in Dhaka City? MSc Thesis paper, BUET, Dhaka, Bangladesh.
- Wilton J.L. (1996) ?Cut-and-Cover Tunnel Structures? In: Bickel J.O., Kuesel T.R., King E.H. (eds) ?Tunnel Engineering Handbook?, Pages 320-359, ) CBS Publishers and Distributors, ISBN 81-239-0543-2, New Delhi, India.
[Md. Munirul Islam, Md. Mahmudur Rahman and Shafiqul Islam. (2019); ANALYSIS OF EARTH RETENTION SYSTEM OF CUT AND COVER METHOD FOR TUNNEL CONSTRUCTION. Int. J. of Adv. Res. 7 (Apr). 1012-1018] (ISSN 2320-5407). www.journalijar.com