POOR FLEXURAL REINFORCEMENT PLACEMENT FACTOR ON THE PERFORMANCE OF CONSTRUCTED DRAINAGE SYSTEM.
- Civil and Water Resources Engineering Department, University of Maiduguri, N.E. Nigeria.
- Abstract
- Keywords
- References
- Cite This Article as
- Corresponding Author
Constructional implementation of good structural design that will translate to the require safety and design economy needs good workmanship. Previous structured studies showed that poor workmanship quality would significantly reduce the serviceability reliability and inadequate checks on constructional control resulted in over 90% of project failure. The statistics are worrisome and challenging. No doubt, flexural reinforcement placement at its designated (tensile or compression) place plays a very important in achieving both the strength requirement and satisfying the serviceability condition. However, a case for haphazardly placed flexural reinforcement for lined-drainage during construction of township road that suffers frequent road embankment failure needs further investigation beyond a structured questioner on the effect of poor workmanship. Hence, this study attempts to access the impact of poor placement of flexural reinforcement at its designated zone primarily due to workmanship error using numerical analysis software. The finding reveals that poor flexural reinforcement placement at its design zone will lead to unnecessary stress built-up and this has far-reaching consequences on the performance of the constructed facility. It was found also that a unit change in flexural reinforcement placement position in the tensile zone towards the neutral axis position result in about 3.1% surge in deformation value.
- Ali, A. A., & Wen, K. H. (2011). Building defects, possible solution for poor construction workmanship. Journal of building performance, 3(23).
- Hamza, M. S., &Mohannad, H. A.-S. (2018). Finite Element Model of a Reinforced Concrete Column Strengthened with Steel Jacket. Civil Engineering Journal, 4(5), 10.
- Mark, G. S. (1997). Concreting workmanship and its inflence on serviceability reliability.ACI Materials Journal, 94(6).
- American Association of State Highway Officials. (1961). Road test. Ottawa, America.
- Othman, N. A., Othuman, M. A., & Md. Sani, N. (2014).Poor workmanship construction of low-cost housing.journal of engineering research and studies, 24(1).
- Sunil, R., &Sonal, T. (2017).Effect of size and arrangement of tension reinforcement on flexural behaviour of Reinforced concrete beam.International Journal of Current Engineering Technology, 7(3), 4.
- Tahsin, R. H., & Md. Rahul, A. (2007).Deflection estimation of two-way edge-supported slabs.Journal of Civil Engineering (IEB), 35(1), 15.
- Thamilarasu, V., Rajprasad, J., & Ram, P. P. T. (2017).A case study on requirements of quality workmanship in construction projects.International Journal of Civil Engineering and Technology, 8(4), 7.
[Kachalla Mohammed. (2018); POOR FLEXURAL REINFORCEMENT PLACEMENT FACTOR ON THE PERFORMANCE OF CONSTRUCTED DRAINAGE SYSTEM. Int. J. of Adv. Res. 6 (Dec). 1350-1356] (ISSN 2320-5407). www.journalijar.com
Civil and Water Resources Engineering Department, University of Maiduguri, Northeast, Nigeria